Category

WIP Wednesdays

6
Dec
2012

One More Shawl?

Can I finish one more shawl in 2012? I’m not sure how I’m doing with the goal of finishing 12 shawls in 2012. I get the feeling it’s not going great, but maybe I can still add one more to the pile.

20121206-002039.jpg

The yarn is Anzula cloud in the colorway “boysenberry,” knit on US size 5s (3.75 mm) needles.

The shape is going to be a larger version of this swatch, with lace in the center section, and a large lace border.

20121206-002424.jpg

I’ve been working on a series of swatches demonstrating different types of shawl construction. Mostly just so that I could have a library of them for reference, but it’s occurred to me that they would also make for a great blog post about different shawl constructions. Would anyone be interested? If so, leave a comment, email me, find me on Ravelry or Twitter and let me know.

So, it’s after midnight, this WIP Wednesday post is (a little) late, and the photo colors are no where near accurate, (must try to start getting photos before the sun goes down) but that’s all for this week.

If you’d like more WIP Wednesday posts, visit Tami’s blog.

14
Nov
2012

WIP Wednesday: Keeping it all in the Air

I’ve never really been a monogamous crafter, I always have multiple projects going on. I like being able to pick up and put down projects as needed. If I’m stuck I like being able to put that project aside for a bit, or even if I’m not specifically stuck I can bounce from one project to another. Of course there are times when I like sitting down and focusing intensely on one thing. But even when I’m focused one project there’s always at least three or four other things happening in the background.

The problem with this method of course is keeping track of it all. Most of the time I’m pretty good at it, there are lots of lists, and post-it notes involved, but generally everything gets done in a timely enough manner.

Every once in awhile though something slips through, I’ll put a project down and forget to (for whatever reason) pick it back up. Which is exactly what happened with this shawl. I put it down because I needed to start the next chart, and then forgot about it.

For three weeks.

Oops.

I thought I remember putting it down because there was some problem that I needed to rip back to fix, but I didn’t see anything when I picked it up to start knitting. Hope that doesn’t come back around to bite me.

Either way, I started the third lace section last night, and am speeding along on it, falling in love the the colors, and the yarn, all over again. I even remembered to stop at the end of a row (something I never do) so that I could spread it out, rather than show (yet another) shot of a brown and purple blob.

For more Work-In-Progress Wednesday posts, check out Tami’s blog.

24
Oct
2012

-1 +1 equals 3

WIP Wednesday two weeks in a row? Crazy.

First off, I ripped the beginnings of the red shawl, but have yet to restart it. And so, the ball has been added back to the pile of projects waiting to be started. The pile is growing at an alarming rate.

I’ve finished three sides, turned the corner and started down the last side of the border on my second Arrowhead Stole. If I don’t get distracted I could finish this week. If I get distracted, who knows (that pile of projects to be started is calling).

I (re)started a hat last night. I changed my mind about the original cable design and had to cast on again with fewer stitches. But now I’m rethinking this version and I haven’t even started the pattern yet. Fingers crossed I don’t have to restart again, but we’ll see how it goes.

This has been getting most of my attention this past week. A couple stripes every day and I’m now almost done with the diamond panel. (Not that you would know that there is a diamond panel from this picture, let along that I’m almost done with it). I have to see if I have a longer needle. If so, I’ll transfer the shawl and try to remember to snap a photo of it spread out.

Until next week?

For more WIP Wednesday, check out Tami’s blog.